Fort Mountain Companies - Home
Home Contact Us FAQs Equipment Sales Allenstown Concentration Yard Awards Forest Update Our Crew Field Reclamation Storm Damage Cleanup Commerical Land Cleaning Forestry Management Our Services Fuelwood About Us




Northern Wood Power
at Schiller Station



Quality Deer
Management Association



Forest Resources
Association




New Hampshire
Timberland Owners
Association



Ruffed Grouse Society

 

Allenstown Concentration Yard

    FMT Hardwood Log Scaling Specifications.
  • Scale is 1/4 Kerf International Rule
  • Trim: 6" on all logs
  • Lengths: veneer log-10', 11', 12', grade log-8'-16'6", pallet log-8'-16'6", must be in 2' intervals
  • All logs must be absolutely straight and fresh cut from living trees.
  • Deductions will be made for: crook, rot, seam, shake, split, stain or sweep.
  • Logs containing metal will be culled. All culled logs become the property of FMT if not picked up within 7 working days
  • Logs need to be cut to specification. The cost to remanufacture the logs will be $25 to $50 per hour.
  • We are able to transport logs from your jobsite to our concentration yard.
  • Scale week ends on Friday, 3pm, payments will be mailed no later than Wednesday the following week.
  • For questions please call our office at 603-485-4459 and talk to Jeff Eames or Patrick Kenney.

HARDWOOD LOG SPECIFICATIONS & PRICE LIST

December 29, 2009

GRADESPECSCHERRY HARD MAPLESOFT MAPLE RED OAKBLACK OAKWHITE OAKBLACK YELLOW BIRCHWHITE BIRCHWHITE ASH
VENEER 10'11'12' 16" min dia NO Defects1500900 700500 700
Prime15"-4Fc 16"-3FC565715265465365 200465365265
#1A13"-4Fc 14"-15" 3Fc465540225415315 200390365240
#111" - 4Fc, 12"-13"- 3Fc, 14"+ - 2Fc340300210315215 200340240215
#210"-13" 2Fc290190120240 205200215165140
#3 Pallet8"-9" 1Fc 10" 0Fc18016590 20520514016550140
GRADESPECSBEECHHICKORYBASSWOODPOPLARBUTTERNUT
Prime15" 4Fc 16"+ 3Fc160160160100100
#1A13" 4Fc 14"-15" 3Fc160160160100100
#111" 4Fc 12"-13" 3Fc 14"+ 2Fc160100 125100100
#210"-13" 2Fc100100125100 100
#3 Pallet8"-9" 1Fc, 10" 0Fc10010050100 100

    FMT Softwood Log Scaling Specifications.
  • Scale is 1/4 Kerf International Rule
  • Trim: 6" on all logs, shear cut logs 12" extra
  • Lengths: grade log-8'-16'6", pallet log-8'-16'6", must be in 2' intervals
  • All logs must be absolutely straight and fresh cut from living trees.
  • Deductions will be made for: crook, rot, seam, shake, split, stain or sweep.
  • Logs containing metal will be culled. All culled logs become the property of FMT if not picked up within 7 working days
  • Logs need to be cut to specification. The cost to remanufacture the logs will be $25 to $50 per hour.
SPECsWhite Pine Grade #1 LogsWhite Pine Long Pallet Grade #2 White Pine Short Pallet Grade X8Hemlock SprucePitch PineRed Pine
8' logs130130 pallet130 pallet75 pallet130 pallet
12' & 16'75 180 grade200 grade190 grade
10',12',14',& 16'235*75 180 grade
Knot (Red) Size (Black)3" (Red) 1" (Black)4" on logs over 12" (red) 2 1/2" on logs 9"-12" 5" trim flushSolid KnotsSolid KnotsSolid Knots Solid Knots
Minimum Top Diameter8" 9" 10"8"8"8"8"
Maximum Butt Diameter34" 30"30"30"30"30"30"

**All Grade 3 softwood not making specs will be paid at $35/M.b.F.

*Call First. Prices subject to change without notice.

PULP PRICING

Softwood PulpTree Length20.00 p/tonOversized8' Only15.00p/ton
Hardwood PulpTree Length20.00p/ton

No maximum length for pulp. Oversize is 23"+. Okay if logs have been cut for a long time.

Logs are unload and scaled in our Allenstown Concentration Yard. Logs need to be cut to specification. The cost to remanufacture the logs will be $25 to $50 per hour.

We are able to transport logs from your jobsite to our concentration yard.

Scale week ends on Friday, 3pm, payments will be mailed no later than Wednesday the following week. Scale ¼ kerf international rule.

For questions please call our office at 603-485-4459 and talk to Jeff Eames or Patrick Kenney.

Allenstown Concentration Yard

Mixed Loads Accepted

Prices effective December 29, 2009. Prices subject to change without notice.


Home | About Us | Commercial Land Clearing | Our Services | Storm Damage Cleanup | Field Reclamation | Forest Management | Our Crew | Forest Update | Awards | FAQ's | Contact Us | Site Map

Fort Mountain Companies
168 Granite St.
Allenstown, New Hampshire 03275
(603) 485-4459 Fax - (603) 485-4469


© 2010 Fort Mountain Companies - All Rights Reserved --